Floodstop Modular Flood Barrier System - 500mm High Barriers

Floodstop Modular Flood Barrier System - 500mm High Barriers

SKU CPP21000741
UOM Each

The Floodstop modular barrier system made of connecting pods that are perfect for protecting driveways, garage doors or the entire perimeter of a building, warehouse or factory.  

  • Overall pod size: 500mm(h) x 1000mm(l) x 500mm(d)
  • Rapidly deployable flood defence system
  • Pods are self-balancing with no bolting required
  • Pods are joined with a weighted connection key (supplied)
  • System can be used as leverage to gain flood insurance


Details

Floodstop Modular Flood Barrier - 500mm

The Floodstop modular barrier is perfect for 'blocking off' and protecting driveways, garage doors, the entire perimeter of a building, warehouse or factory.  
  • Rapidly deployable flood defence system
  • Can be assembled by one person
  • Highly flexible system
  • Affordable large scale flood defence system
  • More cost effective and versatile flood protection than sandbags
  • Self-balancing with no bolting required
  • Modules are joined with a weighted connection key (supplied)
  • 500mm high barrier pod weighs 10kg, connection key weighs 8kg
  • Multi-hub connection pod for easy connection to walls, buildings and creation of corners
  • Units nest into each other for easy storage
  • Recyclable and reusable.
  • Can be used as leverage to gain flood insurance
Each modular unit (excluding the multi-hubs) equates to a metre of barrier. Flood stop barriers are equally as effective when positioned on roads, pavements, driveways, grass and soil.

Installation

Position barrier pods and any required multi-hubs for corners or connections in a line for the required barrier length. Check all self-filling holes are open and can fill with rising waters if flood occurs. In standard configuration every fourth barrier pod should be a 'pre-fill' unit type. Insert wieghted connection keys, ensuring that each key is in connection with the ground. Once connection keys are in place then curvature can be applied to barrier if required. Fill pre-fill units to the brim to ensure preliminary seal alog base of the barrier system.

Disassembly

Remove universal keys then drain water from pre-fill units. Remove barrier pods and any used multi-hubs